Partner institution |
Date of the event |
Description of Dissemination Event |
|
VšĮ „eMundus“, Lithuania, Kaunas | 2018-08-06 | Posts about the event (Educational trip to the natural farm (organized in May) were published online |
VšĮ „eMundus“, Lithuania, Kaunas | 2018-08-06 | Educational event (organized in January, 2018) related to Food pyramid: https://www.facebook.com/healtheducommunity/posts/2114661718859526
|
VšĮ „eMundus“, Lithuania, Kaunas | 2018-08-06 | Radviliškis kindergarten "Žvaigždutė" ("The Little Star") (Lithuania) attaches a large degree of importance to health promotion. Children start and finish the day in kindergarten outside in the playground, they are learning to have fun entertainments and strengthen their health. Ingenious teachers induce children for physical activities, like barefoot walking through “Path of Health”, also children take care of herbals and vegetables in the greenhouse and the garden that were planted by themselves. |
VšĮ „eMundus“, Lithuania, Kaunas | 2018-08-03 | Event was organized in Kampiškiai, Kaunas region. During the event adults were introduced with Methodical material, which was delivered in HealthEDU project by all partners, about the educational events, which were organized at kindergartens and schools, about the experience gained in Natural farms. Kids had possibility to play various games, as the environment and place, where the meeting was organized, is very kids-friendly. |
VšĮ „eMundus“, Lithuania, Kaunas | 2018-07-26 | International conference "Gyvybinės jėgos.
Gyvybinių jėgų atstatymas" ("Life forces.
Restoration of life forces") was organized by Geteanumo Medical section in Dornache and in collaboration with Lithuanian Waldorf Childhood Pedagogical Initiative Association. 140 participants attended the event.
As the conference was also related to health, internal forces, healthy nutrition and kids education from 0 to 21 (3*7), it was a good chance to talk about the project too (during the breaks directly with participants) |
Foundation for development of the cultural BPOCS, Bulgaria, Sofia | 2018-07-19 | Zornitsa Staneva shared a facebook publication originally made by the LT project coordinator and added some further comments about the final project meeting and conference, which took place in Varna in July 2018. |
Pixel Association, Italy, Florence | 2018-07-15 | Project presentation during the fifth meeting of the “L4L” project in Swidnik (PL) |
Foundation for development of the cultural BPOCS, Bulgaria, Sofia | 2018-07-13 | an international conference with participation of all partners under the HealthEDU project for sharing the results |
Florida centre de formacion sociedad cooperativa, Spain, Valencia | 2018-07-12 | Dissemination of the Healthedu Poster at the presentation event of the constitution of 6 research groups related to the strategic and specialization fields of Florida Universitaria. Nearly 60 research professors take part of these research groups, which also have external collaborators. These research groups are active in European projects. |
European Lab for Educational Technology, Greece, Sparta | 2018-07-09 | A short article about healthEDU was published in a popular educational blog: http://omathimatikos.gr/healthedu-%CF%83%CF%8D%CE%B3%CF%87%CF%81%CE%BF%CE%BD%CE%B5%CF%82-%CE%B5%CE%BA%CF%80%CE%B1%CE%B9%CE%B4%CE%B5%CF%85%CF%84%CE%B9%CE%BA%CE%AD%CF%82-%CF%80%CF%81%CE%B1%CE%BA%CF%84%CE%B9%CE%BA%CE%AD%CF%82/ |